This is the area where the shelter will be placed. The piers have been placed by the LA Ski Club.
The piers have rebar coming out of them rather than a bolt to anchor the beams, so we will have to figure out a way to anchor the beams onto the piers.
Driving the materials up Camp May Road.
Preparing to unload at the site.
Edward supervising Darryl and Gary in unloading the prefab walls for the Supervisor's structure.